NTC
COE Implementation Defined
Key Elements
j
llth ACR CoC & OPFOR Changeover Ceremony
❖ Systems & Equipment
❖ ROE / RID
*> Rotational Training Objectives
*> Scenario Design
❖ TRADOC DCSINT validation
ROT 02-08 (2/4
ID)
30 APR O^A-
COE OPD to all Officers
15 APR 02
Doctrinal Material
Complete
OTHER KEY MILESTON
11 FEB 02 H ROT 02-05 (1/4 ID) (TTP Scrub)
'begin transition}
DCSINT COE MTT (NOV 01)
COE LTP Completed (JAN 02)
Initial COE TTP Development ( AN
Uniform Development (FEB 02
TTP Revision (MAR 02)
NTC
Training Required Prior to
Implementation
Players
- 1 l»h ACR (MTT, PATs, OPDs, OPFOR Academy,
Rotations)
- Operations Group
- Rotational Units (LTP, Home Station,
Institutional)
- Senior Trainers / Leaders
NTC
Environmental Variables
Physical Environment
- Complex Terrain
- Urban Centers (Live, Force on Force)
Nature/stability of the state
- Operations Group (Country Study, Road to War,
Scenario Design)
Sociological Demographics
- Operations Group (COBs, NGOs, Media, Political,
ROE)
NTC
Environmental Variables (cont.)
Regional/global relationships
- N/A
Military capabilities
- Order of Battle
- Zero Sum Gain, Near Term
- POM
Information
- Limited, with potential for growth (Computer Attack,
Propaganda, PSYOPS)
- Operations Group (INN, Radio Interviews)
NTC
Environmental Variables (cont.)
Technology
- Asymmetric, based on availability, authorization and
funding
- Counter Counter-Measures to establish parity
- Spectrum limitations at NTC
Supra-national organizations
- N/A
National Will
- N/A
NTC
Environmental Variables (cont.)
Time
- Rotational Design
- Continuous Operations (Battle Periods vs.
Vignettes)
Economics
- State resources dedicated to military capability
NTC
HICON Transition Requirements
SIM / STEM Wrap Around (Flank Unit Control)
IFC (BH 27)
Paramilitary TACON to BTG
SPF / UAV DTG Control
DTG Control of Mission Sets to Achieve Training
Objectives
Increased Requirement for OPFOR O / Cs.... internal
TDA increase for Operations Group
New Star Wars Building
Instrumentation Upgrade
NTC
FM 7-100 Series Implementation
• 7-100.1 & .2 integrated into scenario design and
operations
• TTP development in conjunction with .4 / .5
• 7-100 series will evolve with implementation
1th Division Tactical Group
PROGRAM ^
STEM TOTALS
tl*
DES
SB
;ure
E DELTA
11th ACR
INTERIM
DEI
T-80/OSTV-T
51 (63)
41
(50)
- 13
42 (50)
- 13
OSV
128 (160)
104
(128)
- 32
114 (137)
- 23
OSWV APC
0
64
(78)
+ 78
0
0
AT (Wheel)
12
44
(53)
+ 41
24
+ 12
AT (Towed)
6
12
(17)
+ 11
8
+ 2
AT (NLOS)
0
12
(17)
+ 17
0
0
Recon (Wheel)
8(10)
20
(25)
+ 25
20 *
o *
Recon (Tracked)
8
10
(13)
+ 5
10 (12)*
o *
ADA (2S6 SP)
6
6
0
6
0
ADA (Towed)
0
6
+ 6
0
0
MANPADs
28
84
+ 56
44
+ 12
Engineer Co
2
3
+ 1 Co
3
+ 1C
INFANTRY
Soldiers
300
400
+ 100
400
+ 100
AT- 5
6
27
+ 21
12
+ 6
RPG/AT-7/13
140
243
+ 103
243
+ 103
Flame (RPO-A) 0
117
+ 117
117
+ 117
AGL
0
18
+ 18
0
0
Sniper Rifles
0
0
46
+ 46
:e: Total number including floats in parentheses
COE CAPABILITY
CAPABILITY
COE REPLICATION
CURRENT REPLICATION
CAN REPLICATE
WITH NO ADDITIONAL RESOURCES
MANUEVER
Light/AT Heavy
Amnor/Mech Support
Armor/Mech Heavy
Liqhtlnf/AT Support
NO
Need additional INF/AT
PRECISION MUNITIONS
Ballistic Missile
Laser Guided
KRASNOPOL
YES
TARGET AQUISITION
IL-220U
with sound ranqinq
ARK-1
(Poor Replication)
YES
ANTI-TANK
Direct and Non-Line of Sight
Mounted / Dismounted
Systems
AT-5 (Mounted/Dismounted)
2A45M (Towed)
RPG-16 (Dragon)
RPG-18 (Viper)
YES*
Need #5 & Personnel
UAV
3 Systems
Simulation Only
YES
NBC
Indirect, Aerial and
SPF Delivered
CHEM/BIO
PCHEM/NPCHEM
delivered by artillery only
YES
EW
Intercept/DF HFA/HF
VHF/HF J ammers
GPS J ammer
TLQ (80 Mhz)
TRQ-32 (520 Mhz)
HEXJAM
NO
Need Systems
DECEPTION
Full Size
Deception OSV/T-80
Turrets
YES*
If Funded
SURVEILLANCE
LRF Bino
Handheld Thermal
LRF/LTD
Thermal in OSV
Limited Handheld Thermal
LTD simulated by M ELIOS
YES*
SPECIAL OPERATIONS
SPF Company
None
NO
Need Authorization & Troops
TERRORIST/INSURGENT
High Priority
PPG Low Priority
(Ops Grp Control)
YES*
Will be 11 ACR Control
COMPLEX TERRAIN
Heavy MOUT, Mountain,
Forest Swamp
Mountain
Very limited MOUT
YES*
Need substantial MOUT Tng
COE CAPABILITY
CONT.
CAPABILITY
COE REPLICATION
CURRENT REPLICATION
CAN REPLICATE
WITH NO ADDITIONAL RESOURCES
AIR DEFENSE
Primarily shoulder Fired,
decentralized, ambushes
SA 8, 9, 18, 2S6ASET IV
Centralized C2
YES
Need more personnel for SA18 teams
MRL
TYPHOON, ASTROS II
Lonqer ranqe, fewer systems
BM21
YES
Via SAWE/Notional units
AP/AT MINES
Many systems, non metallic,
widely used
TM 89, MOD, UMZ
NO
Need AP mine
SNIPER
SVD, Barret and other long
range systems
M16, rarely replicated
YES*
Need longer range system to better
replicate
ROTARY AIR
Gazelle, J et Ranger, HIND
HIP
KA-50 HOKUM (Huey)
MI-8 HIP (Blackhawk)
YES*
Huey fleet aging and incapable of
portraying a modern attack helo
C2
Decentralized, secure corns,
cell phones, small signature,
redundant
MRR J TOC, TOC
Cell phones, single channel secure
FM
YES
NTC
Changes to ROE
In draft for JUNE 02 implementation
COE RID less restrictive
Battle Plans (CBI) tailors the BTG
NTC
Comments
Training Objectives (Concur)
Exercise Design (Concur) - Need to enforce 350-50-1
OPFOR constrained by ROE / RID (Unknown) - Currently
rewriting. Battle Plans (CBI) establishes OPFOR capabilities
CSA Guidance "equal chance to win", training objectives vs.
training outcome (Concur) - Tailor the force to meet training
objectives - rheostat
Air to Ground Integration
- CAS, Blue - High War, Multiple sorties. Dominant shaper
- CAS, Red - Low War, Limited sorties and BDA, Does not facilitate
SHORAD training
- Rotary Wing, Blue - Needs TES solution (AGES II)
- Rotary Wing, Red - Need upgrade to engagement system
Ground to Air Integration
- Blue, Training opportunities limited to rotary wing
- Red, Training opportunities limited to rotary wing